No-Deploy Windows
No-deploy windows let you block deployments during recurring weekly periods. For example, use one to avoid deploying during a Monday morning traffic spike, or during a weekly batch job.
Configuring windows
Section titled “Configuring windows”On a project’s Settings page, under No-Deploy Windows:
- Set the project’s timezone (an IANA name like
Europe/Amsterdam; defaults to UTC). All windows for the project are interpreted in this timezone, regardless of the server’s own timezone. - Add one or more windows: a day of the week, a start time, and an end time (both in
HH:MM, 24-hour).
A project can have multiple windows, on the same or different days. Each is checked independently: a deploy is blocked if the current time falls inside any configured window.
What’s blocked
Section titled “What’s blocked”Manual deploys, webhook-triggered deploys, and API deploys are all blocked while a window is active. Attempting one returns an error:
deploys are paused by a no-deploy window (Monday 10:00–12:00 Europe/Amsterdam); next allowed at 12:00- A manual deploy click shows this as a flash message.
- A webhook or API deploy request gets it back as a
403JSON response.
What’s allowed
Section titled “What’s allowed”Rollbacks always bypass no-deploy windows. A rollback is a recovery action, not a forward deploy, so it’s never blocked. That includes the automatic rollback triggered by a failed health check.
Fail-open behavior
Section titled “Fail-open behavior”If Conveyor can’t read the configured windows for a project (a transient database error), it logs an error and allows the deploy rather than blocking it. A failed window check should never silently block a deploy that nothing is actually configured to block.
See How Deployments Work for what a deploy actually does once it’s allowed to proceed.